A new platform.
The business logic stays.
I move websites and data, change hosting and update the technical foundation. The transition accounts for content, page addresses, integrations and the way your team works.
All services
Migration begins with inventory
Moving a site is not just about copying files. You need to understand what data and scenarios should be preserved, what will change in the new system, and how to switch the working project. We draw up a migration map and determine in advance the conditions for checking and returning to the previous version.
Transition to 1C-Bitrix
Comparing the structure of the old CMS with the new one: pages, catalog, properties, users and orders. We check the transferability of each type of data separately.
Changing hosting
We transfer files and the database, check the environment, site mail, certificate and background jobs. We are planning to switch domains.
Change of domain and structure
We are preparing the correspondence of old and new addresses, redirections and updating of internal links. Checking the indexing settings.
Updating the environment
We are assessing the compatibility of the CMS, modules and code with new versions of server software. We include the necessary corrections in the transition plan.
What is important to save
Data and connections
Cards, sections, images and related records must go to the right places. We check quantities and sample values, not just appearance.
Work processes
We coordinate the behavior of forms, orders, notifications and exchanges. At the time of switching, we determine the procedure for working with new incoming data.
Addresses and availability
We create a map of redirects and check important URLs. This reduces the risk of losses when moving, but does not guarantee maintaining positions in the search.
From task to result
We conduct an audit of
We collect the structure, volume of data, integrations and environmental requirements.
Making a trial migration
Deploying a test version, converting data and testing scenarios.
Getting ready to switch
We will agree on the work window, final synchronization and return plan.
We check after launch
We control availability, key addresses, forms and exchanges.
What you receive
A website in a new location or a new platform, verified data and a list of completed settings. We provide a map of changes and recommendations for follow-up.
How the cost is calculated
The estimate is influenced by the source system, the quality and volume of data, the number of integrations and the permissible switching window. Design updates and new features are priced separately from migration.
Submit a task for evaluation ↗Frequently asked questions
Will it be easy?
Depends on systems and requirements for data relevance. We plan the transfer method and switching window in advance; It is impossible to promise no downtime without studying the project.
Can I save page addresses?
We save if possible. For changed addresses, we prepare appropriate redirections and check their operation.
Bitrix update - is it a migration?
Not always. Regular service refers to escorting. We consider a complex transition with an outdated version of the CMS, environment and incompatible modifications as a separate project.